发行时间:2020.01.11
总页数:25
编辑:
综保科技
摘要:
report to congress on the annual long-range plan for construction of naval vessels for fiscal year 2020
prepared by: office of the chief of naval operations deputy chief of naval operations (warfare system requirements - opnav n9) 2000 navy pentagon washington, dc 20350-2000
march 2019
the estimated cost of this report or study for the department of defense is approximately $313,000 in fiscal years 2018 - 2019. this includes $19,000 in expenses and $294,000 in dod labor.
2019mar05 refid: 0-26726...